ARUSIK GHAZARYAN: GRAPHIC & UI/UX DESIGNER FOCUSED ON HUMAN-CENTRIC DESIGGN. CURRENTLY EXPLORING VISUAL ART, INTERACTION, AND DIGITAL EXPERIENCES.

VISUAL DESIGNER REMOTE / FULL-TIME / PARTT-TIME / PROJECT-BASED BASED IN ARMENIA //

9:02:50 PM

1/5/2026

ARUSIK GHAZARYAN: GRAPHIC & UI/UX DESIGNER FOCUSED ON HUMAN-CENTRIC DESIGGN. CURRENTLY EXPLORING VISUAL ART, INTERACTION, AND DIGITAL EXPERIENCES.

VISUAL DESIGNER REMOTE / FULL-TIME / PARTT-TIME / PROJECT-BASED BASED IN ARMENIA //

9:02:50 PM

1/5/2026

THIS WEBSITE IS A WORK IN PROGRESS—BUT IN THE BEST WAY POSSIBLE. IT’S FULLY FUNCTIONAL, BUT I’’M ALWAYS REFINING, UPDATING, AND MAKING IT EVEN BETTER. CHECK BACK ANYTIME TO SEE WHAT’S NEW!

Project Proposal for NEO Stucco

Logo Design & Website Design/Development

Stage

Description

Deliverables

Timeline

Revisions

1. Logo & Brand Discovery/Briefing

Online brand brief to align on business goals, brand values, vision, target audience, and visual inspiration. Includes initial research and positioning.

Completed brand brief

2–3 days

-

2. Logo Design

Concept development with 1–2 initial logo directions, refinement of the selected concept, and final delivery in all required formats.

• Logo files (SVG, PNG, JPG)
• Simplified logo usage guide

1-2 weeks

1 round

3. Website Research & Benchmarking

Competitive and benchmark analysis focused on layout, structure, user flow, and best practices within the industry.

Research insights

2 days

2 rounds

4. Moodboard & Visual Strategy

Definition of the visual language for the website, including:

• Typography system (headlines & body text)
• Color palette concepts
• Photography / icon style direction
• UI components (buttons, cards, menus, hero layouts)

Visual strategy presentation

2–3 days

1 round (minor edits)

5. Design Direction Proposal (Mini UI Concepts)

Instead of low‑fidelity wireframes, 2–3 high‑fidelity visual sections are designed to define the final look and feel of the website. This sets the design direction for the full build.

Design direction presentation

1-2 weeks

2 rounds

6. Final UI Design & Website Build

Full website design based on the approved direction, including:

• All website pages (main page + up to 8–9 additional pages)
• Popups and interactive elements
• Desktop & mobile versions
• Smooth component logic and transitions

Fully designed and developed website

2-3 weeks

-

7. Final Delivery & Launch

Quality assurance, testing, domain connection (if required), final adjustments, website launch, and handover.

• Live website
• Full access transfer

2-3 days

-

* Note 1: Timelines are approximate and flexible, depending on feedback cycles and changes. * Note 2: Client feedback should be provided within 2 days to keep the project timeline on track and complete the project within the agreed timeframe. * Note 3: Due to the Christmas and New Year holidays, there may be a few non-working days during this period, which could slightly affect the timeline.

Design & Development Options

Option / Tool

Description

Pros

Cons

  1. Figma → Framer

The full UI is designed in Figma. After approval, the website is rebuilt and developed in Framer.

• Clear separation between design and development
• Easy collaboration during the design phase

• Requires rebuilding everything in Framer (double work)
• Longer timeline and higher cost
• Potential for minor inconsistencies between design and final build

  1. Framer (Design + Development)

Design and development are done directly in Framer. The prototype you see is the final live website.

• Fastest production timeline
• 1:1 design = final build
• Live, interactive previews
• Easy future edits and flexibility
• Fully responsive and SEO‑friendly

• Requires familiarity with hybrid design/dev tools (fully covered by my experience)

* Note: If Option 1 (Figma → Framer) is selected, the overall project timeline will be approximately 2–3 weeks longer, as the website must be fully designed in Figma and then rebuilt in Framer. Recommendation: I recommend Option 2 (Framer) for greater efficiency, cost-effectiveness, and a smoother design-to-launch process.

Price Option 1

Logo Design + Website (Figma Design → Framer Development)

Amount

Advance

$1800

Upon Completion

$1800

Total

$3600

Note

Higher cost due to double workload — full design in Figma and full rebuild in Framer.

Price Option 2

Logo Design + Website ( Framer Design + Development)

Amount

Advance

$1300

Upon Completion

$1400

Total

$2700

Note

Lower cost because design and development happen in a single tool, with no duplication of work.

* Note 1: Pricing includes logo design + 1 website (main page + up to 8–9 additional pages). * Note 2: Website copywriting and Framer subscription costs are not included.

2025// ALL RIGHTS RESERVED (KINDA—WHO’S REALLY KEEPING TRACK?)

2025// ALL RIGHTS RESERVED (KINDA—WHO’S REALLY KEEPING TRACK?)

2025// ALL RIGHTS RESERVED (KINDA—WHO’S REALLY KEEPING TRACK?)